| Tgl | Ket | Masuk | Keluar |
| 5 Maret 2025 | Belanja Material Bon3 | Rp 6.265.760 | |
| 5 Maret 2025 | Belanja Material Bon2 | Rp 105.000 | |
| 5 Maret 2025 | Belanja Material Bon1 | Rp 5.304.245 | |
| 26 November 2024 | Biaya perbaikan Paving Blok Halaman Masjid | Rp 160.000 | |
| 24 November 2024 | Pembelian pasir 1/4 Colt | Rp 120.000 | |
| 3 November 2024 | Pembayaran Tagihan Listrik Masjid Nurul Jannah Bulan November 2024 | Rp 831.000 | |
| 3 November 2024 | Pembayaran Tagihan PDAM MNJ Bulan November 2024 | Rp 30.000 | |
| 3 November 2024 | 8 pcs Tas untuk petugas pengambilan kencleng Tabah | Rp 134.600 |
| Luas Area | 412 m2 m2 |
| Luas Bangunan | 380 m2 m2 |
| Status Lokasi | Fasilitas umum yang dikuasai Pemkot Depok (girik) |
| Tahun Berdiri | 2007 |